Learn how to install fiber cement siding from tim larson the product application specialist of allura usa.
Fiber cement siding installation clips.
Aligning clips are designed for use with all makes of 5 16 cement fiber and hardboard siding that require a 1 1 4 overlap.
Clips act as an extra pairs of hands that hold your lap siding level and secure while you fasten it in place.
Jaime prefers to use the vinyl mounting blocks typically used with vinyl siding.
This h molding joint eliminates the need for caulk and has an authentic woodgrain appearance with the durability of fiber cement.
Follow these steps and review the video above to ensure that you know the correct procedure for installing fiber cement siding.
These gauges practically eliminate layout time and reduce the fatigue of installation making them ideal for getting the job done.
Most fiber cement manufacturers make mounting blocks for lights electrical receptacles a c lines pvc venting etc.
Consistency our spacer clips are made to give you a precise consistent overlap of your siding.
The pac tool gecko siding gauge can help you gauge and install fiber cement siding up to 48 faster and allow for 1 person installation.
You will be assured that each subsequent board is not only level it will also have the correct overlap.
They re cheaper and easy to install and you can cut the proper size hole in a plastic mounting block with a utility knife or a snips.
Fiber cement siding may be a different material than wood or vinyl but a good installation is not difficult nor time consuming.
We have dozens of installation specialists throughout the u s.
As a homeowner you will work with a contractor who will facilitate the installation of your james hardie siding trim soffit wrap and flashing products including products with colorplus technology.
Tim teaches you how to properly prepare and insta.
This color matched 7 1 4 inch h molding joint covers and protects butt joints and elegantly provides an expansion joint to help prevent buckling or distortion.
When you start just make sure the first row is level.
And canada who are available to work with any contractor or builder.