Jb shinglefix significantly reduces the time taken to install cedar shingles.
Fitting cedar shingle roof tiles.
It is the 1 composite synthetic roofing material alternative for homeowners and residential roofing contractors looking for alternatives to cedar shake shingles slate spanish clay tile barrel tile concrete tile asphalt shingles and metal roofing.
Wood shingles are more susceptible to leaks than composite or asphalt shingles because they don t lock as tightly or lay as flat as traditional shingles.
Form the drip edge either dressing into gutter.
Request free samples to see why cedur roofing shakes are better.
Or nailing to fascia at 5cm centres.
Includes useful advice on the best materials to use together with informat.
Ensure the shingles are positioned square to the line of the eaves and verge.
Ridges see our available ridges here when you reach the ridgeline you will need to cut the shingles to maintain the 125mm gauge the shingles can be cut with a hand saw or by using a stanley blade to score them.
Fix by nailing top edge of detail strip using 10mm galvanised clout nails.
Maintain the broken bond pattern throughout the roof and ensure a 5mm gap is left between each cedar shingle.
Position and unroll the detail strip square to the line of the eaves.
Cut each shingle to fit at the end of each row.
When installing ridge and hip shingles work inwards from the edges.
Step by step guide on how to apply bituminous roofing shingles to your shed roof.
Use pre formed shingle ridge tiles and nailing twice fix these into place with a minimum overlap that is the same as the shingle gauge on the roof covering.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Cedar shingles are a traditional building material used for both roofing and siding.
Minimum pitch for cedar roofs if you desire a cedar roof for your home the ideal pitch for your roof ranges from a five pitch to a 12 pitch.
Space the shingles 1 8 inch apart to allow for expansion.
Step 3 put the next shingle about one eighth to one quarter of an inch away from the edge of the first shingle.
Use a waterproof membrane under the batten and counter batten to make sure the roof doesn t leak.
Secure it to the roof by driving in two nails near the top edge of the shingle about 1 inch below its top edge.